Platform Mounted Parallel Bars
Materials needed and assembly:
- 2 sheets of 4’x8’x3/4” plywood screwed together
- 6 - 4” diameter galvanized threaded pipe flanges to receive 1” diameter threaded galvanized pipe. Use 1 1/4” heavy duty screws to attach flanges to plywood base.
- 6 - 36” long 1” diameter galvanized pipe threaded both ends to serves as vertical posts.
- 4 - 41 1/2” 1” diameter galvanized pipe threaded both ends to serve as rails.
- 4 - 90 degree elbows to receive threaded pipe at ends of rails and vertical posts.
- 2 - T connections located mid rail to receive threaded rails and vertical posts.